Friday, 22 February 2013

Reliability

| |SHUZWORLD |


Memo


To:Shuzworld Managers

From:Mary Patterson

CC:Cynthia Crowinshield

Date:12/3/2012

Re:Reliability of the Computer Driver Shoe Machine Process

As you are aware I was asked by Mr. Dieter Handel to show what the flowing reliability of the railway cars were, how to improve reliability and in case of failure back up one of the machines with a machine that leave perform with the same reliability.

Since we are 3 individual machines and operators the turn formula to use is Rs. Each machine has its own send of reliability, which is feasible with the decision analysis tool. The formula is very simple.

We calculate the output from all trine machines and multiply. Then we have our general rate for all three jobs combined. See the following map:

|(untitled) Solution |
| |Parallel strategy 1 |Parallel system 2 |Parallel system 3 |
|Component 1 |.84 |.91 |.99 |
|Prll System Rel |.84 |.

Ordercustompaper.com is a professional essay writing service at which you can buy essays on any topics and disciplines! All custom essays are written by professional writers!

91 |.99 |
|Overall Reliability |.7568 | | |
| | | | |



As you can apprehend by the chart, right now the reliability of all three jobs is .7568 or rounded .76

Next I was asked to back up one machine in case the other failures. This is referred to Redundancy. utilize this analysis will ensure that if the machine with the lowest reliability breaks down (Job 1), then it will have job 2 to fall back on. The formula is created by (the probability of the offset printing machine breaking don) x (the probability that the backup machine will work) x (the...If you want to get a entire essay, order it on our website: Ordercustompaper.com



If you want to get a full essay, wisit our page: write my paper

No comments:

Post a Comment